tpiTok ples
Putim Anode
video

Putim Anode

As tingting: Longpela taim korosen kontrol bilong ol paiplain long solwara, aninit long solwara, swamp na ol paiplain we ol i planim
Standet: DNVGL-RP-F103, DNV-RP-B401, ISO 15589-2, NACE SP0169
Ol kain anode:Sacrificial (Zn, Al, Mg alloys),ICCP (MMO, graphite, silicon-iron)
Rot bilong putim: Ol i weldim o pasim stret long paip, putim insait long simen weit koting (CWC), putim klem o sadel, putim aninit long wara long ol daiva/ROV, putim pawa ICCP rod sistem wantaim ol 'rectifier'
Ol gutpela samting long sait bilong teknikel: Sevis laip: 20-40 yia, Gutpela distribusen bilong karent, wankain CP kaverej, Seif long ol ples we i gat hevi/long solwara, Gutpela wok insait long ol sabmarin na swamp paiplain
Ol wok: Ol paiplain long solwara, ol 'risers', ol 'J-tubes', ol 'river crossings', ol 'bured pipelines'
Askim wok painimaut
Prodak Introdaksen

Mining bilong putim CWC Anode

 

Anode instolesenem wok bilong pasim ol 'sacrificial anodes' long wanpela paiplain-long rot bilong weldim, pasim/strepim, o putim ol insait long CWC leia-olsem na ol 'anodes' i ken bagarap pastaim na 'steel pipe' i stap gut olsem hap bilong 'cathodic protection' (CP) sistem. Long CWC koted paip, em i gat tu wok bilong bosimposisen bilong anode, rot bilong stretim, na lukautim bilong kebololsem na ol 'anode' i save wok gut long lektrik na i no bagarap taim ol i holim, putim, o weldim long fil.
Tupela bikpela sistem i stap:

  • Ol 'sacrificial anodes' (Zn, Al, Mg):Em i isi, i no gat wok long stretim, em i gutpela long ol wara na graun we i no dip tumas.
  • Impressed Current Anodes (MMO, Si-ain):Em i gat pawa long ol 'rectifier', yu ken stretim, em i gutpela long ol paiplain long dip wara na longpela taim.

Octal Pipe i save disainim na putim ol anode sistem bihainim DNVGL-RP-F103, ISO 15589-2, na NACE standet, na i save givim gutpela spesing, bonding, na rot bilong putim (welded, clamped, o CWC embedded).

 

anodes embedded in CWC concrete weight coated pipeline installation detail ICCP impressed current cathodic protection anode system installation on pipeline

 

Ol Stendet Bilong Putim Anode & Seleksen Bilong Kain Anode (CP Kompliens)

 

Samting bilong putim anode Wanem samting em i karamapim Tipikel jois / toksave Ol standet na gaid bilong refrens
Anode instolesen kompliens CP sistem disain bilong ol paiplain we i stap aninit long wara; aksepsen fremwok bilong instolesen na komisin Yusim long stretim 'anode layout', 'attachment method', na ol 'turnover' pepa bilong ol 'offshore'/subsea/buried lines DNVGL-RP-F103(sabmarin CP long ol 'galvanic anodes');DNV-RP-B401(subsea CP praktis);ISO 15589-2(CP bilong ol paiplain sistem bilong petrolium na ges);NACE SP0169 / SP0177(ekstenel korosen kontrol bilong ol paip aninit long graun/submerj)
Anode installation type: Sacrificial (galvanic) Nogat pawa bilong ausait; samting bilong anode i save bagarap long lukautim paip Zink / aluminium / magnesiumol aloi; i save kamap long ol wara we i no dip tumas, ol ples tais, na ol graun we ol i laikim ol samting we i no hatwok long lukautim ol Planti taim ol i save yusim aninit long CP disain besis antap (projek spesifik i makim ol samting na spes)
Kain bilong putim anode: ICCP CP i gat pawa wantaim autput we yu ken stretim long rot bilong ol 'rectifier' MMO / graphite / silicon-ainol anode; planti taim ol i save yusim long ol 'deepwater' o 'long-'distens paiplain we 'current demand' na 'control' i antap moa Planti taim ol i save yusim aninit long CP disain antap (projek spesifikesen i makim pawa/kontrol na monitoring rikwaemen)

Rot bilong putim cWC paip

 

Anode Installation octal

Folem DNVGL-RP-F103, stretpela instolesen bilong ol anode em i bikpela samting long mekim gutpela distribusen bilong karent na longpela taim. Octal Pipe i save givim planti rot bilong putim paiplain bihainim disain na envairomen bilong paiplain:

1. Weldim samting (ol pad / breslet)

Kontrol bilong ples:Ol i putim ol 'anode' long abrusim ol 'field joints', ol sapot, na ol hap we i save paitim ol 'stingers', 'rollers', o 'tensioner' kontek.

Weld + koting ripea disiplin:Ol i makim ol hap bilong weldim, na bihain ol i stretim na pasim 'coating' bilong stopim "liklik paia, bikpela korosen sel."

Proteksen bilong kebol:Routing i stap gut na i gat gutpela lukaut olsem na em i no ken pas taim yu holim na daunim.

2. Klem/strap mounting (anode installation kit)

Kit skop klia:Wanpela kain 'anode installation kit' i gat 'clamp/saddle body', ol 'strap'/'fastener', 'insulation pads', 'continuity cable', na ol samting bilong pasim 'sealing'-olsem na kontrakta i no wok long mekim ol samting long ples.

Kwaliti bilong kontek:Ol i save bosim ol 'fit surfaces' bilong abrusim 'high-resistance contact' we i save kamap long ai tasol bihain i no wok long pawa.

Anti-loosing na transport handling:Ol i makim 'strapping' bai em i ken stap laip long taim bilong trak, apim, na putim 'tension' na i no senis.

3. I stap insait long CWC (bilong lukautim CP long paip we i gat hevi bilong simen)

Putim jiometri:Ol i bosim 'recess/cover' olsem na 'anode' i no inap kisim bagarap na 'drag' taim em i wok gut yet long lektrik.

Ol 'cable exits' na 'sealing':Ol i lukautim na pasim ol 'cable exit points' bai ol i no ken kamap olsem ol 'snag point' o rot bilong wara.

Pinis bilong ol senis:CWC/anode zone i gat wok bung wantaim ol 'welding cutbacks' olsem na 'field joint coating' i ken kamap klin (taim ol i makim).

 

Putim aninit long wara:

Long ol sabmarin paiplain, ol i save putim ol 'anode' long solwara long rot bilong ol daiva o ol kar we i save ron longwe (ROV).

Ol i save yusim ol spesel 'clamps' na 'welding systems' bilong mekim ples bilong en i stap gut na stret.

DNVGL-RP-F103 i makim ol rot bilong putim spes na pasim ol samting bilong mekim CP i karamapim wankain.

Pawa Anode Rod Instolesen (ICCP):

Ol i putim ol 'anode rod' (MMO, titanium-based) arere long rot bilong paiplain.

Konektim long ol 'transformer-rectifiers long graun o antap long ol pletfom.

Em i save givim 'adjustable current', we i gutpela long ol 'deepwater pipeline' we i gat bikpela CP diman.

 

pasin bilong putim anode

Yusim dispela olsempasin bilong putim anode'baseline' na taitim long ITP bilong yu we i gat nid:

Bipo-konfemesen bilong wok:Konfemim koting sistem, CWC bildim-ap (sapos i gat), anode spesing plen, na "no-go" zon klostu long ol fil join/sapot.

  1. Makim & fit-ap:Makim ol ples long wanwan droing; sekim kliarens bilong putim ol ikwipmen na ol ples bilong holim.
  2. Atesmen:Putim long weldim o 'clamp/strap' rot; sekim rot bilong ol kebol na rausim hevi.
  3. Sekim wok i go het:Mekim ol sekim bilong lektrikel kontinuiti/resistens na rekodim ol risaltaim ol i makim insait long PO/ITP.
  4. Silim na stretim:Stretim/stretim ol bagarap long 'local coating', pasim ol 'cable exit', na sekim gen ol hap we ol i stretim pinistaim yu makim.
  5. As-dokumen we ol i wokim:Apdetim ol anode ID/ples na ol tes rekot bilong komisin na fiuja CP monitoring.

 

Ol gutpela samting bilong teknikel

 

Anode Installation octal pipe

Ol rot bilong putim 'anode' bilong Octal Pipe i save givim strongpela 'corrosion control' wantaim planti teknikel benefit:

Laip bilong sevis i go longpela moa:

DNVGL-RP-F103 disain i mekim gutpela hevi bilong anode, spes, na kapasiti, na i mekim 20-40 yia bilong gutpela katodik proteksen.

Gutpela Distribusen bilong Karent:

Enjiniaring disain i mekim na paiplain i gat wankain 'polarization'.

I stopim 'localized underprotection' o 'overprotection', we tupela wantaim inap long kamapim 'coating disbondment'.

Sefti long ol ples we i gat hevi:

Ol sistem bilong mekim sakrifais i no nidim pawa, na dispela i save rausim ol hevi bilong paia long ol hap we paia i save kukim.

Ol i wokim ol ICCP sistem wantaim otomatik monitoring na karent kontrol long mekim gutpela wok.

Integresen wantaim ol Koting na CWC:

Em i wok wantaim FBE, 3LPE, 3LPP, na CWC koting, na i givim tupela samting, korosen na buoyancy stebiliti.

Em i mekim 'coating' i stap gut taim em i putim 'redundancy' long CP.

Pasin bilong senis:

Sacrificial CP – Simpol, liklik-mentenens, gutpela long ol ples we wara i no dip tumas.

ICCP – Yu ken stretim, i gutpela long ol dip wara na longpela-ekspot paiplain.

Pefomens long solwara we i kamap klia:

Ol i yusim long ol sabmarin paiplain, ol 'risers', na ol 'J-tubes', na inapim ol 'offshore design safety margins' bilong DNV.

 

Anode Installation long CWC Coated Pipe (Kliarens, Damej, na Kebol Proteksen)

 

Long wanpelaCWC kotim paip lain, anodeinstolesenem i no long CP karent autput tasol. Hevi we inap kamap em olsem ol 'anode' na 'cables' i kamapol 'snag/impact points'long taim bilong pulim-in, apim yad, kontektim rola, na putim operesen-na bihain projek i save baim ol wok bilong stretim na sekim gen. Dispela seksen i lukluk long putim 'anode' long paip long wanpela rot we i save stap gut long lektrik na ol i ken wokim long rot bilong CWC handeling na 'field welding'.

 

Hevi bilong gaden i stap long CWC lain Anode instolesen kontrol ol i yusim long CWC kotim paip Wanem samting baia i ken askim / failim (taim ol i makim)
Bodi bilong 'anode' i paitim ol 'roller' o 'stinger' o kamap olsem wanpela 'snag point' taim yu pulim -in / putim Tok klia long "no-kontakt zon" na kliarens i mas go long ol tensen/rola; makim rot bilong pasim (weldim / klem / putim insait) bihainim rot bilong holim Droing bilong layout wantaim no-go zon; stetmen bilong pasin bilong pasim ol samting; olsem-list bilong ples bilong anode we ol i wokim
Bagarap bilong ol kebol long pulim, apim ol sling, o paip-i go long-paip kontek taim ol i bungim Roting bilong ol kebol wantaim 'strain relief', ol 'protected runs', na ol 'sealed exit'; abrusim ol 'loose loop' we i stap ples klia Ditel bilong rot bilong kebol + rot bilong pasim; 'visual checklist'; stretim/ri-test log (sapos i gat)
Simen arere i bruk nabaut long hap bilong pasim bihain long trenspot Kontrolim ol samting we i save pas long en, noken putim ol 'anode seats' long ol arere we i no strong tumas; makim ol 'handling point'/ol 'stacking' rul bai ol 'anode zone' i no ken kisim hevi Ol toksave bilong holim/pekim ol samting; ol poto bilong banis sapos yu askim; Ol mak bilong kisim bagarap sapos i stap insait long PO/ITP
Bagarap bilong 'coating' long ol 'welded pads' / 'clamp contact points' i save kamapim ol 'local corrosion cells' Tok klia long ol step bilong redim pes na stretim ol 'coating' klostu long ol hap we ol i pasim; sekim ol hap we ol i stretim pinis (taim i gat nid) Rekot bilong stretim 'coating'; holide tes/re-sekim rekot (taim yu makim)
Ol i painimaut olsem pawa i no wok gut leit (bihain long putim o pastaim long ol i kirapim) Yu mas sekim 'continuity/resistance' long ol stej we yu wanbel long en na kisim ol risal Kontinuiti/resistens tes rekot: rot + as bilong kisim + ol risal (taim ol i makim)

 

Anode Spacing & Layout Rules (Abrusim Field Joint Conflicts)

 

Planti wok bilong putim 'anode' i save kamap bikos ol i raitim ol 'spacing rules' olsem "X meters typical" na ol i no tingimol fil join, CWC katbek, na putim ol ikwipmen kontek. Ol rul aninit i helpim long holim 'layout' i ken kamap long 'CWC coated pipe' na tu i lukautim CP disain tingting.

 

Rul bilong layout Bilong wanem em i bikpela samting long CWC kotim paip Hau long tokaut long en long PO / droing
Putim ol 'anode' i stap ausait long ol 'field joint coating zones' Ol 'field joint' i nidim klinpela rot bilong weldim, NDT, na 'field joint coating'; ol 'anodes' klostu i save kamapim hevi long 'clearance' na 'coating' Nogat ol 'anode' insait long - mm/m bilong ol 'field joint' / 'girth weld zones' (longwe long wanwan projek disain)
Putim ol 'anode' i stap longwe long ol 'concrete-free end / end transitions CWC ends em i nambawan 'handling' na 'repair zone'; sapos ol i putim nogut dispela i save mekim 'spalling' i go antap na i save slouim 'fit-up' Nogat 'anode attachment' insait long CWC transisen na 'concrete-free end length (state cutback length per spec)
Makim ol 'roller/tensioner' kontek zon olsem "no-go" Ol rola/stinga inap long krungutim ol kebol o paitim ol 'anode bodi' taim ol i pulim -in/leim Nogat ol 'anode' insait long ol 'equipment contact bands' (ol i luksave long 'lay method')
Noken kisim ol sapot, ol ben, na ol bikpela -stres hanling poin Ol klem, sling, na sapot i save pundaun klostu long ol ben/sapot poin; ol anode i kisim bagarap pastaim Noken putim anode long ol sapot/ben/handling lift poin (long droing)
Lukim spes olsem "disain intent + konstraktibiliti sekim" CP spesing i mas inapim disain, tasol laspela plesmen i mas stap laip long konstraksen Spesing long wanwan CP disain; laspela 'layout' bai ol i mas sekim wantaim 'field joint map' na 'handling plan' pastaim long putim 'coating'/dispatch

 

 

Kontektim nau

 

FAQ

 

 

product-470-408

Q 1 - Hau bai yu stopim ol hevi bilong pawa taim ol i putim ol 'anode' long ol paip we i gat simen long en?

A:Bilongol paip i gat hevi bilong simen, plen bilong putim i mas gat ol samting bilong stopimlektrikel kontek namel long ol 'anode' na 'concrete reinforcement', na dispela i mas stap insait long IPS/ITP. (DNV gaidens i tok long dispela nid bilong ol paip we i gat simen na i bungim wantaim plening bilong wok/inspeksen.)

Q 2 - Wanem samting i mas stap insait long wanpela 'anode installation procedure'?

A: stretpasin bilong putim anodeplanti taim ol i save raitim olsem wanpela IPS/ITP-redi wok we i karamapim wok bilong kisim/holim/putim ol 'anode', ol piksa bilong putim (wantaim ol 'tolerance'), sekim/testim ol samting bilong pasim, na raitim ol rekot. Dispela "procedure spec" rot i stap klia insait long DNV gaidens bilong ol sabmarin paiplain.

Q 3 - Wanem ol pepa i mas kam wantaim 'anode installation' (bilong kisim na senisim)?

Taim ol i makim insait long PO/ITP, ol samting we i save kamap long 'turnover' em:as-built anode location list/IDs, sekim lista bilong putim/pasin, na olgeta samting we i mas kamaprekot bilong tes bilong kontinuiti/resistensna tu ol wok bilong stretim 'coating'/re-tes log sapos ol i bin stretim. Ol standet gaidens i tok strong long holim ol droing bilong instolesen, inspeksen/testing, na ol rekot olsem hap bilong pepa bilong paket.
Ol setifikesen

 

CE Certificate

CE Setifiket

ISO 9001 Certificate

ISO 9001 Setifiket

API Q1 Certificate

API Q1 Setifiket

ABS Certificate

ABS Setifiket

AP-5L Certificate

AP-5L Setifiket

API-5CT Certificate

API-5CT Setifiket

 

Ol standet:DNVGL-RP-F103, DNV-RP-B401, ISO 15589-2, NACE SP0169

Ol kain anode:Sacrificial (Zn, Al, Mg), ICCP (MMO, graphite, silicon-iron)

Rot bilong putim:Weldim, strapim, CWC i stap insait, klemp, aninit long wara, ICCP stik

Ol aplikesen:Ol paiplain long solwara, ol paiplain bilong sabmarin, ol ples tais, ol paiplain we ol i planim

Sevis Laip:20-40 krismas

Hot Tag: CWC anode installation, China CWC anode installation manufacturers, suppliers, factory

Askim wok painimaut

whatsapp

Fon

E-mel

Wok painimaut